Ever thought about how steel buildings are made? The procedure is both complicated and precise. The creation of a steel building is an awesome combination of engineering, draftsmanship, ingenuity, teamwork, knowhow and metal building manufacturing expertise. Each building receives the maximum attention and care throughout the manufacturing process, made by experienced craftsmen and watched over by way of a dedicated staff of execs from start to finish. Precision engineering, machinery and components plus exceptional qc yield a precision high quality manufactured product.

steel building prices

After a customer has obtained a pre-engineered steel building or metal building system, their sales person, who performs multiple functions to build consultant, building designer, technician and estimator, forwards the purchaser's order to the steel building factory. Within the top metal building factories, the factory itself fabricates all required building components in house. Like that, all components are compatible and go together easily at work site without surprises with no waiting for components to come from different suppliers.

steel buildings

On the steel building factory, your order entry department oversees an order from start to finish, from the moment the order is received until the steel building is shipped. Steel building factory staff verifies all design codes, snow and wind loads and seismic information to ensure that everything complies with the purchaser's contract and enters your order into appointment scheduling software to ensure the buildings manufacture is efficiently managed.



Pre-engineered steel buildings engineers are accountable for optimization of the steel building, each engineer certified through the state where the building will be constructed. Building details including snow and wind loads and seismic information is input into a professional metal building computer software that generates engineered shop drawings for the framing from the building as well as other drawings necessary for the buildings manufacture and construction.



The metal building factory's pre-engineered steel building engineers review the building drawings and look the acquisition order again for accuracy. Permit drawings are generated you can use to aid secure permits to erect the structure.



Actual building production starts off with the input to build specifications into CNC (Computer Numerical Control) machinery, an activity that requires the use of computers to control machines programmed with CNC machining language (G-code). The CNC machinery controls all machine features including feeds and speeds.



Components of steel buildings, such as I-beams, gutters and down spouts, sidewalls and end wall panels, as well as standing seam roofs are systematically produced in designated areas called "lines" throughout the metal building factory. Each manufacturing line completes a specific function, automated by use of conveyors that move the steel sheeting, I-beams and fabricated metal components from station to station. Since each steel building is produced to acquire, building components are made as required to fulfill each steel buildings exact specifications.



The manufacture of steel buildings rafters and columns starts with the Plasma Table. The Plasma Table cuts the internet, the middle of the rafter or column (such as the center of the letter "H"). The web moves with a holding station waiting to move by automated conveyor to the station in which the web is going to be tack-welded to the flange.



The flange machine cuts flanges into specified lengths determined by the pre-engineered buildings specifications from steel bar stock. After cutting, the flanges move to a holding station waiting to move by automated conveyor towards the station where the flanges will probably be tack-welded online prior to going through the automatic welding machine.



Certified welders tack-weld flanges and webs in place to make rafters and columns. The tacked rafters and columns move by conveyor towards the PHI machine. On the PHI machine, an automatic welding process fuses the web and flange materials, permanently welding the flanges to the web. A Welding Inspector checks all welds to make sure that strict AISC standards are met.



Roof and sidewall panels are fabricated from steel sheeting. Large coils of metal sheeting are placed in a machine called an "uncoiler" which passes the sheeting through another machine termed as a "straightener" that straightens the sheet. The straightened sheet is die cut and passes through a roll former to get the straightened sheet the form of roof or sidewall sheeting. As with all machinery inside the steel building factory, computers are feeding information to the metal corrugation machine giving it the precise specifications for each and every building.



Sophisticated machinery on the Trim Line automates the process by which custom trim is made and ensures exact bends and ideal angles. You start with a coil of steel installed on an uncoiler, the steel passes through a straightener to some number of ten roll formers that form the shape of each trim making all trim components: rake trim, corner trim, jamb trim, head trim, base trim, eave trim, rake angle, base angle, gutter straps, downspouts and gutters.



Out in the yard the Staging Department gathers all of the steel building components and punctiliously loads them onto trucks to supply the building for the job site. Special attention is given towards the Bill of Materials ensuring that every order is done and accurate. The Traffic Office handles the shipment of each building, scheduling trucks and coordinating buildings to arrive at the work site on time in which the erection crew holds back for delivery.